An ERP evaluation needs more than a module list. The same “production planning” heading may mean standard stock products in one business and engineer-to-order work with subcontracted operations in another. Bringing these five deliverables to the first discussion turns expectations into a scope that can be tested.
1. Map the journey of one order
Select an order that represents your business, without sharing real customer information. List quotation, technical approval, purchasing, production, quality, dispatch and invoicing on one page. For each step, identify the owner, the record they use and the information passed to the next team.
For example, show which record tells planning that an order quantity has changed. Do not hide steps handled through email or personal spreadsheets: the process people actually use is what matters when defining the project scope.
2. Prepare a small but representative master-data sample
Before attempting to migrate a whole database, start with one finished product, its components, raw materials and related work centres. Assign owners for item codes, units, conversions, bills of materials, revisions and routings.
- Does the same material have more than one item code?
- Is the conversion between purchasing and consumption units explicit?
- Is it clear which orders should use each bill-of-materials revision?
- Where are scrap, subcontracted operations and quality holds recorded?
This sample is a data-readiness check, not proof that all company data is clean. Track the issues found in a separate list with owners and target dates.
3. Define an end-to-end pilot, not just a screen tour
Run the representative order from material requirements through dispatch. Include the normal flow and two exceptions, such as a material shortage and a change in order quantity. Write down the expected result before running the transaction.
For example, if 100 units of a component are required and 80 are in stock, agree what should be shown after reservations and open purchase orders are considered. This is an illustrative test scenario, not a claim about a particular ERP's default calculation method or a delivery guarantee.
4. Document acceptance criteria and integration boundaries
Instead of saying “the report must be correct”, specify which report should reconcile with which values in which source. Identify the user running each check, the expected output and the person accepting the result.
For integrations, describe data direction, the system of record, transfer frequency, retries after failure and duplicate detection. Do not plan an integration as an already available capability before confirming that an accessible interface exists.
5. Prepare the go-live decision and rollback plan
Define the transfer time and verification owners for open orders, stock balances and opening values. Include training, user permissions, backups and support contacts in the same plan. Assess trial migration results against the acceptance criteria.
If critical checks fail, it should be clear who can postpone the transition and how the previous working arrangement will be restored. Finalise the schedule based on data readiness and pilot results; no single duration fits every business.
What should you bring to the first meeting?
A process map, anonymised sample data, a pilot scenario, an acceptance checklist and a draft transition plan provide a useful starting point. This guide does not promise every function in a specific product; product fit and project scope require a separate assessment.