This short guide introduces the desktop workflow for instrument
transformer manufacturers.

00:00:08.972 --> 00:00:18.565
We will use real application screens and saved examples to explain
inputs, engineering results, excitation curves, and technical
documents.

00:00:19.700 --> 00:00:28.588
After extracting the complete package into a writable local folder,
start the application and create your internal user account.

00:00:28.588 --> 00:00:31.852
The evaluation includes twenty worked examples.

00:00:31.852 --> 00:00:38.866
In Offer List, select an example to inspect its saved specification,
status, and engineering details.

00:00:40.000 --> 00:00:46.548
Use Load into Calculation Form to open the selected offer's inputs in
the appropriate calculation page.

00:00:46.548 --> 00:00:50.490
This prepares a new request without replacing the saved offer.

00:00:50.490 --> 00:00:58.501
Review the customer, project, electrical requirements, and available
construction options before starting another calculation.

00:00:59.700 --> 00:01:05.288
For a cast resin current transformer, begin with the construction type
and standard.

00:01:05.288 --> 00:01:11.607
Check the voltage and insulation level, frequency, installation,
thermal current, and duration.

00:01:11.607 --> 00:01:14.334
These selections influence other choices.

00:01:14.334 --> 00:01:19.456
Use the available values rather than assuming every combination is
supported.

00:01:20.600 --> 00:01:26.266
Next, define the connection arrangement, primary ratios, and secondary
cores.

00:01:26.266 --> 00:01:31.122
This example has four cores with different secondary requirements.

00:01:31.122 --> 00:01:35.316
Review current, accuracy class, and burden for each core.

00:01:35.316 --> 00:01:43.411
Class-specific inputs, such as knee-point voltage, are available where
the selected calculation requires them.

00:01:44.600 --> 00:01:47.303
Read Request Summary before calculating.

00:01:47.303 --> 00:01:51.560
It describes the requested transformer, not a completed result.

00:01:51.560 --> 00:01:56.493
Mould Availability lists permitted candidates for the current
selections.

00:01:56.493 --> 00:02:05.750
An available candidate is not yet a feasibility guarantee; the
calculation evaluates the design using your configured manufacturing
data.

00:02:06.900 --> 00:02:09.795
When your request is ready, use Calculate.

00:02:09.795 --> 00:02:16.894
This guide does not run a new calculation; the screen here shows a
previously saved successful example.

00:02:16.894 --> 00:02:22.408
Check the result status and inspect material cost, labour cost, and
offer price.

00:02:22.408 --> 00:02:27.715
Review alternative-burden results carefully against the original
requirement.

00:02:28.900 --> 00:02:33.565
The saved offer includes primary and secondary calculation details.

00:02:33.565 --> 00:02:41.294
Select the secondary result you want to inspect, and review the
available core, winding, and electrical values.

00:02:41.294 --> 00:02:49.441
These details help you understand the design behind the price; they do
not replace your engineering approval process.

00:02:50.600 --> 00:02:54.712
Open Curve Preview to inspect an archived excitation curve.

00:02:54.712 --> 00:03:00.984
Where several secondary curves are available, choose the required
secondary from the list.

00:03:00.984 --> 00:03:05.723
Curve availability depends on the calculation and core construction.

00:03:05.723 --> 00:03:12.065
Some results, including certain composite-core designs, do not provide
an excitation curve.

00:03:13.200 --> 00:03:19.481
Use the document buttons to access Technical Sheets, Customer Sheets,
and Bills of Materials.

00:03:19.481 --> 00:03:24.951
This is an actual sample customer-sheet page with a secondary curve
and its data.

00:03:24.951 --> 00:03:32.785
Included sample drawings and prices are for evaluation only, not
manufacturing approvals or software licence prices.

00:03:33.900 --> 00:03:39.317
The voltage transformer page provides its own construction and winding
options.

00:03:39.317 --> 00:03:44.185
Check the primary voltage and the displayed minimum and maximum
limits.

00:03:44.185 --> 00:03:48.917
Then define the secondary voltages, classes, burdens, and load types.

00:03:48.917 --> 00:03:54.471
This example combines three secondary windings, including an earth-
fault winding.

00:03:55.600 --> 00:04:04.131
For toroidal current transformers, review insulation material, output
cable, frequency, thermal requirements, and dimensions.

00:04:04.131 --> 00:04:07.953
Define the primary ratios and the secondary requirement.

00:04:07.953 --> 00:04:13.276
In this example, three ratios have their corresponding burdens shown
together.

00:04:13.276 --> 00:04:17.985
Always check the summary before calculating with your own dimensions.

00:04:19.100 --> 00:04:26.501
The Parameters section lets you work with your own customers, moulds,
materials, and pricing definitions.

00:04:26.501 --> 00:04:31.717
Here, the mould list shows dimensions, voltage options, and control
order.

00:04:31.717 --> 00:04:38.202
Parameter editing is available in the evaluation, while the supplied B
H table is read-only.

00:04:38.202 --> 00:04:40.951
Validate changes before production use.

00:04:42.100 --> 00:04:45.686
Press F one for page help and F two for Quick Start.

00:04:45.686 --> 00:04:52.858
The evaluation includes twenty examples and three hundred sixty-five
additional successful calculations.

00:04:52.858 --> 00:04:57.203
Alternative-burden successes count; failed calculations do not.
